Zvi Schneider
2014-08-25 09:00:43 UTC
The IR LED should be connected to PB1 pin of the ATTami.
In my ATTiny virtual wall for Roomba I'm using timer 1 to produce the 38KHz
IR modulation. The timer output is directed to the PB1 pin.
Attached here is the schematic of the virtual wall. Later on I'll put the
entire design to the wiki.
---------- Forwarded message ----------
From: Zvi Schneider <schneider.zvi-***@public.gmane.org>
Date: Sat, Aug 23, 2014 at 11:13 PM
Subject: Re: do you have plans for making an ir shield for the attami?
To: Yair Reshef <yair99-***@public.gmane.org>
To start with we need:
1. 950 nm infrared LED COM-09349 from Sparkfun (or equivalent).
2. IR receiver diode TSOP38238 from sparkfun (or equivalent).
Each of them is connected directly to one of the I/O lines of the ATTami.
Since two lines are used by the USB and one line is dedicated for the reset
that lives as with only one free I/O line.
We can use that line to sense a small amount of keys using your idea (A/D
input with resistors).
In my ATTiny virtual wall for Roomba I'm using timer 1 to produce the 38KHz
IR modulation. The timer output is directed to the PB1 pin.
Attached here is the schematic of the virtual wall. Later on I'll put the
entire design to the wiki.
---------- Forwarded message ----------
From: Zvi Schneider <schneider.zvi-***@public.gmane.org>
Date: Sat, Aug 23, 2014 at 11:13 PM
Subject: Re: do you have plans for making an ir shield for the attami?
To: Yair Reshef <yair99-***@public.gmane.org>
To start with we need:
1. 950 nm infrared LED COM-09349 from Sparkfun (or equivalent).
2. IR receiver diode TSOP38238 from sparkfun (or equivalent).
Each of them is connected directly to one of the I/O lines of the ATTami.
Since two lines are used by the USB and one line is dedicated for the reset
that lives as with only one free I/O line.
We can use that line to sense a small amount of keys using your idea (A/D
input with resistors).
What do you mean now? Hours? Days?
I can start preliminary design tomorrow. Usually I like to discuss things
before deciding. It might take few days.
Can you define the requirements?
It is almost morning, I'm going to catch some sleep. Lets continue
tomorrow.
I can start preliminary design tomorrow. Usually I like to discuss things
before deciding. It might take few days.
Can you define the requirements?
It is almost morning, I'm going to catch some sleep. Lets continue
tomorrow.
no, sunday.
please try to have something ready, even parts you wold like to use.
we need to order now!
050-6301212
tlv, israel
please try to have something ready, even parts you wold like to use.
we need to order now!
We need to discuss it.
After our last conversation I still not sure regarding the requirements.
Are you back already?
--After our last conversation I still not sure regarding the requirements.
Are you back already?
receiver transceiver
plus button/s
--
050-6301212
tlv, israel
plus button/s
--
050-6301212
tlv, israel
050-6301212
tlv, israel
--
archive and web access >https://groups.google.com/forum/#!forum/hasadna
---
âק×××ת ××××¢× ×× ×××××× ×©××ª× ×× ×× ×ק×××Š× 'TAMI' ×ק××׊×ת Google.
××× ×××× ×ת ×ך×ש×× ×ק×××Š× ××× ×××׀ס×ק ×ק×× ××× × ×××"×, ש×× ×××"× ×× hasadna+unsubscribe-/JYPxA39Uh5TLH3MbocFF+G/***@public.gmane.org
××× ××€×š×¡× ××××¢×ת ×ק×××Š× ××, ש×× ×××"× ×-hasadna-/JYPxA39Uh5TLH3MbocFF+G/***@public.gmane.org
××׀שך×××ת × ×ס׀×ת ×קך ×-https://groups.google.com/d/optout.
archive and web access >https://groups.google.com/forum/#!forum/hasadna
---
âק×××ת ××××¢× ×× ×××××× ×©××ª× ×× ×× ×ק×××Š× 'TAMI' ×ק××׊×ת Google.
××× ×××× ×ת ×ך×ש×× ×ק×××Š× ××× ×××׀ס×ק ×ק×× ××× × ×××"×, ש×× ×××"× ×× hasadna+unsubscribe-/JYPxA39Uh5TLH3MbocFF+G/***@public.gmane.org
××× ××€×š×¡× ××××¢×ת ×ק×××Š× ××, ש×× ×××"× ×-hasadna-/JYPxA39Uh5TLH3MbocFF+G/***@public.gmane.org
××׀שך×××ת × ×ס׀×ת ×קך ×-https://groups.google.com/d/optout.